conduit_fill

shallow

ai.sparkquote/nec-calculators · Verify this server

Percent fill and maximum number of THHN/THWN-2 conductors of one size in EMT or PVC Schedule 40, from NEC Chapter 9 Tables 1, 4 and 5.

100.0/100

1 trials · measured 2 days ago

conduit_fill scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against ai.sparkquote/nec-calculators, measured 20 Oct 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-10-20100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: conduit_fill
[![Vouch score](https://vouch.tools/api/tools/45629e90-f177-41da-bcb9-85994b57d792/badge.svg)](https://vouch.tools/tools/45629e90-f177-41da-bcb9-85994b57d792)
conduit_fill — Vouch