cost_scenario

shallow

io.github.danha2048/tde · Verify this server

Retired. This tool was retired on 20 Oct 2026, use test_order. TDE no longer projects your costs from past episodes or price indices. It answers that line until 19 Nov 2026 and is then removed. `profile` and `horizon_months` are accepted and ignored. Retired: it serves no figure, so there is no provenance stamp to read. Information, not advice.

100.0/100

1 trials · measured 10 days ago

cost_scenario scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.danha2048/tde, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-11-12100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: cost_scenario
[![Vouch score](https://vouch.tools/api/tools/ef3b65ff-a3a3-495e-8837-a909e044fea3/badge.svg)](https://vouch.tools/tools/ef3b65ff-a3a3-495e-8837-a909e044fea3)
cost_scenario — Vouch