compare_timeline_scenarios

shallow

io.github.theluckystrike/gantt-timeline · Verify this server

Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan_project_timeline plus 1 to 4 scenarios, each with changes (extra_days, a new duration, or a new start-no-earlier-than date). Returns the baseline and each scenario's end date, the delay in working and calendar days, the new critical path, tasks that became or stopped being critical, and how much of each slip was absorbed by float. Does not change or save the plan. Do not use for the first schedule of a project (use plan_project_timeline).

100.0/100

1 trials · measured 11 days ago

compare_timeline_scenarios scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.theluckystrike/gantt-timeline, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-11-12100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: compare_timeline_scenarios
[![Vouch score](https://vouch.tools/api/tools/ed2e864a-6205-4f87-9318-2f284f7a7974/badge.svg)](https://vouch.tools/tools/ed2e864a-6205-4f87-9318-2f284f7a7974)
compare_timeline_scenarios — Vouch