connection_route

shallow

com.ampworth/calculators · Verify this server

Work out which ENA connection procedure a domestic installation of solar panels, batteries or both falls under: connect first and notify the distribution network operator within 28 days, or apply and wait for approval before anything is connected. The rules are the ENA's engineering recommendations, not MCS documents: EREC G98 for small installations, EREC G99 for everything larger, and EREC G100 for export limitation. Every test is in amps per phase at a nominal 230 V, and it applies to the premises as a whole, so list EVERY inverter that can export, existing ones included. A battery counts as generation even if it only ever charges from the panels. The figure that counts is each inverter's registered capacity: its AC rating, or a lower limit the manufacturer has fixed. It is NOT the panels' kWp. A 4.4 kWp array on a 3.68 kW inverter is a 3.68 kW installation. Where an inverter has been capped below its hardware rating, give the hardware rating as 'designCapacityKw', because G99 tests that separately. The routes are: G98 when the total is 16 A per phase or less (3.68 kW single phase, 11.04 kW three phase); G99 SGI-1, also connect and notify, when the total is within 16 A but an inverter built for up to 32 A has been capped; G99 SGI-2 and SGI-3, fast track applications answered within 10 working days, which allow larger totals held back by a type-tested export limiter; and the standard G99 application for anything else. An export limiter NEVER brings an installation under G98. IMPORTANT: this says which procedure applies, not what the operator will decide. Approval depends on the local network, which only the operator can assess. Say so whenever you report a result. Method from EREC G98 / G99. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

100.0/100

1 trials · measured today

connection_route scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.ampworth/calculators, measured 20 Oct 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-10-20100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: connection_route
[![Vouch score](https://vouch.tools/api/tools/ec8a99ff-59fe-43c8-98cb-34bd51d0eafe/badge.svg)](https://vouch.tools/tools/ec8a99ff-59fe-43c8-98cb-34bd51d0eafe)
connection_route — Vouch