plan_to_valuation

shallow

io.github.inity13/agentstack-mcp · Verify this server

COMPOSITE (simulate -> compute). Project a scenario, take a per-period cash-flow line from its projections ('cashflow_metric', e.g. 'mrr' or 'net_burn'), and value it exactly: NPV at a discount 'rate', IRR, and undiscounted total. Optional 'initial_investment' becomes the period-0 outflow (needed for IRR). Combines ScenarioSim + PrecisionCalc.

100.0/100

1 trials · measured 8 days ago

plan_to_valuation scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.inity13/agentstack-mcp, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote + stdio
Credential class
open
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-25100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: plan_to_valuation
[![Vouch score](https://vouch.tools/api/tools/e5e4c5a6-3d3a-4fd4-80a9-3aef09127538/badge.svg)](https://vouch.tools/tools/e5e4c5a6-3d3a-4fd4-80a9-3aef09127538)
plan_to_valuation — Vouch