pcc_get_request_critical_path

shallow

network.capability/physical-capability-cloud · Verify this server

Get the critical path (longest dependency chain) for a capability request. The critical path determines the minimum calendar time to complete the request. Returns node IDs in order, the full node details, and total hours on the critical path.

100.0/100

1 trials · measured 1 day ago

pcc_get_request_critical_path scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against network.capability/physical-capability-cloud, measured 6 Oct 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-10-06100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: pcc_get_request_critical_path
[![Vouch score](https://vouch.tools/api/tools/e2c56e70-7d56-4799-94fd-b66ba872badb/badge.svg)](https://vouch.tools/tools/e2c56e70-7d56-4799-94fd-b66ba872badb)
pcc_get_request_critical_path — Vouch