pause_post

shallow

com.flomixy/mcp · Verify this server

Pause a scheduled post: status becomes paused, scheduledAt is kept and nothing is published until resume_post. Only scheduled posts can be paused (publishing/published: 409 POST_NOT_PAUSABLE, not retryable). Requires a key with write scope.

100.0/100

1 trials · measured 13 days ago

pause_post scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.flomixy/mcp, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
gated
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-11-12100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: pause_post
[![Vouch score](https://vouch.tools/api/tools/e19325bc-571c-4b34-a694-14011b04aaf8/badge.svg)](https://vouch.tools/tools/e19325bc-571c-4b34-a694-14011b04aaf8)
pause_post — Vouch