create_gantt

shallow

com.loopgantt/mcp-server · Verify this server

Create a Gantt chart from a task list — no account or API key needed. YOU author the plan: list the tasks in execution order with realistic working-day durations and dependencies (0-based positions of earlier tasks; use { task, type, lag } for start-to-start/finish-to-finish links or lag). Milestones have duration 0. LoopGantt schedules it with its critical-path engine and returns a picture of the chart, the dates, the critical path and a link where the user can view, export (PNG/PDF) and save the chart. Always show the user the link.

100.0/100

1 trials · measured 2 days ago

create_gantt scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.loopgantt/mcp-server, measured 31 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-31100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: create_gantt
[![Vouch score](https://vouch.tools/api/tools/e1418956-087b-43f5-8140-dcb15263bfce/badge.svg)](https://vouch.tools/tools/e1418956-087b-43f5-8140-dcb15263bfce)
create_gantt — Vouch