planitude_workload

shallow

app.planitude/planitude · Verify this server

Shows how much each person on the project works per day, week or month and who is over-allocated: for each person the load as a percentage of their availability (personal calendar x max units), the tasks causing it and the date ranges above 100%. The scheduler does not level resources: an over-allocation is solved by moving or reassigning tasks, or by changing assignment units. Read-only.

100.0/100

1 trials · measured 11 days ago

planitude_workload scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against app.planitude/planitude, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
gated
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-11-12100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: planitude_workload
[![Vouch score](https://vouch.tools/api/tools/d867b482-417c-4b4f-a939-0a43321882e9/badge.svg)](https://vouch.tools/tools/d867b482-417c-4b4f-a939-0a43321882e9)
planitude_workload — Vouch