get_plan_transition_dates
shallowio.github.theluckystrike/student-loan-repayment-assistance-plan-calculator-mcp · Verify this server
Lists the dated steps of the federal student loan repayment overhaul: SAVE ended by court order (March 2026) with 90-day servicer notices from July 1, 2026 plus a final 30-day notice; RAP and the Tiered Standard plan from July 1, 2026; deferment and forbearance limits on loans from July 1, 2027; PAYE and ICR end and remaining borrowers move to RAP or IBR on July 1, 2028; the Parent PLUS consolidation deadline of June 30, 2028. Marks each as past or upcoming against a date and gives the current status of every plan.
1 trials · measured 10 days ago
get_plan_transition_dates scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.theluckystrike/student-loan-repayment-assistance-plan-calculator-mcp, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-11-12 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/ce3833fb-7d4b-479e-8fe7-438be091ca47)