support_lifecycle

shallow

au.com.assetize/maximo · Verify this server

IBM Maximo / MAS support-lifecycle facts: end-of-support / Extended Support transitions and the 2026/2027 deadlines, drawn from source-backed lifecycle records and the curated Change Watch. Optionally scope to a version.

100.0/100

1 trials · measured 1 day ago

support_lifecycle scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against au.com.assetize/maximo, measured 6 Oct 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
open
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-10-06100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: support_lifecycle
[![Vouch score](https://vouch.tools/api/tools/ce36b29a-1d0a-4521-80c3-db7bbf700a48/badge.svg)](https://vouch.tools/tools/ce36b29a-1d0a-4521-80c3-db7bbf700a48)
support_lifecycle — Vouch