calculate_progressive_payment
shallowsg.cashew/mcp · Verify this server
Model the monthly instalment profile of a Singapore Building Under Construction (BUC) property loan across progressive payment stages. Handles fixed and floating rate packages, per-stage cash/CPF/loan funding split, drawdown timing, rate stepping by year, and optional prepayments. Set includeSchedule to true for the full month-by-month amortisation schedule (summary is always included).
1 trials · measured 11 days ago
calculate_progressive_payment scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against sg.cashew/mcp, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-11-12 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/cdc68f04-2c40-4c27-8446-f5bfbf2931ec)