get_large_load_terms
shallowcom.open-factory/open-factory · Verify this server
What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, exit fee and realistic energization year, each cell linked to the tariff or docket. Optional filter by market, utility or state.
1 trials · measured today
get_large_load_terms scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.open-factory/open-factory, measured 20 Oct 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-10-20 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/b71e17f7-cd9b-4a9f-b30a-ffcaaf305258)