get_lead_times
shallowcom.open-factory/open-factory · Verify this server
Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, ATS, drives), each with the OEM or publisher and its date. Optional text filter on the class name. Edition history and per-product OEM rows are paid.
1 trials · measured today
get_lead_times scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.open-factory/open-factory, measured 20 Oct 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-10-20 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/b292bb2f-cfb9-4f25-8845-8f93f4661c1c)