calculate_compute_energy_cost
shallowcom.trustbaselab/rcb-data · Verify this server
Purpose: a transparent compute-facility energy and cost estimate - IT load x PUE x hours (x tariff). Guidelines: supply it_power_kw; optionally pue (otherwise a published benchmark from the dataset is used and cited), hours (defaults to a full year) and electricity_price (without it only energy is returned). Limits: excludes non-cooling auxiliary loads, transmission losses, demand and capacity charges, green-power premia and carbon cost; the tariff must come from the caller. Ex: calculate_compute_energy_cost(it_power_kw=1000, electricity_price=0.6).
1 trials · measured 35 days ago
calculate_compute_energy_cost scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.trustbaselab/rcb-data, measured 20 Oct 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-10-20 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/a9f87415-c577-41db-9d0c-ec95a96dff11)