get_build_timeline
shallowloan.multifamilyconstruction/multifamilyconstruction-loan · Verify this server
Census Survey of Construction averages for apartment buildings: months from permit to start and from start to completion, by U.S. region and building size (5-9, 10-19 or 20+ units), for one completion year with the ten-year trend, plus what the build length means for HUD upfront MIP and construction interest.
1 trials · measured 11 days ago
get_build_timeline scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against loan.multifamilyconstruction/multifamilyconstruction-loan, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-11-12 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/a9db913c-92e7-485b-b560-57afb254ba43)