wedding_checklist
shallowwedding.latido/latido · Verify this server
Latido's planning checklist (Hungarian legal steps included: szándékbejelentés, documents, witnesses, name change), scheduled to a wedding date: every item with its phase, category and due date, compressed proportionally when the runway is shorter than 12 months. Filter by phase (start/book/shape/finish/week/after) and depth (essentials ≈27 · core ≈93 · everything ≈115). Use for "what should we be doing now" questions.
1 trials · measured 2 days ago
wedding_checklist scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against wedding.latido/latido, measured 31 Aug 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-08-31 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/a4cbd62f-c0fb-407c-98e6-9f29b78a03a3)