monte_carlo_estimate

shallow

io.github.physics-star-cat/lowriskquotes-montecarlo · Verify this server

Run a three-point (triangular) Monte Carlo simulation over cost line items. Use when a user needs a realistic range for a quote, budget or project cost instead of a single guess. Returns total-cost percentiles (p10/p50/p80/p90) and per-item breakdown.

100.0/100

1 trials · measured 73 days ago

monte_carlo_estimate scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.physics-star-cat/lowriskquotes-montecarlo, measured 11 Sept 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-09-11100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: monte_carlo_estimate
[![Vouch score](https://vouch.tools/api/tools/9c684114-a3f8-4a6c-a5f6-3d230da7afcb/badge.svg)](https://vouch.tools/tools/9c684114-a3f8-4a6c-a5f6-3d230da7afcb)
monte_carlo_estimate — Vouch