duty_cycle_budget
shallowengineer.calc/calc · Verify this server
Calculates LoRa duty cycle budget for EU868, US915, AS923, and AU915 regulatory regions. Computes maximum messages per hour, minimum transmission interval, and effective data rate under regional duty cycle constraints. EU868 and AS923 enforce 1% duty cycle (ETSI); US915 has no duty cycle limit but a 400 ms dwell time per channel (FCC); AU915 has no duty cycle limit. Flags dwell-time-limited regions where packet airtime must not exceed the dwell time. Chain from lora_airtime to get airtime_ms input for end-to-end regulatory compliance analysis.
1 trials · measured 56 days ago
duty_cycle_budget scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against engineer.calc/calc, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- self-provisionable
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-08-25 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/9b23a373-5e1a-49e4-9a59-f896ba16548a)