insert_notion_mermaid_diagram

shallow

com.mermaidchart/mermaid-mcp · Verify this server

Append a Mermaid diagram as a code block to a Notion page. The block is added at the end of the page content.

100.0/100

1 trials · measured 8 days ago

insert_notion_mermaid_diagram scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.mermaidchart/mermaid-mcp, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
open
Category
Developer infrastructure
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-25100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: insert_notion_mermaid_diagram
[![Vouch score](https://vouch.tools/api/tools/9980ea05-f191-49fe-83dd-4c493bd91cf0/badge.svg)](https://vouch.tools/tools/9980ea05-f191-49fe-83dd-4c493bd91cf0)
insert_notion_mermaid_diagram — Vouch