estimate_bom

shallow

io.github.yyphilo/openfab · Verify this server

Estimate costs for a multi-part bill of materials in one call. Each part: {process, quantity, material?, bounding_box_mm?, tolerance_mm?, finish?}. Returns per-line estimates, a BOM total, and the longest lead time. Indicative and non-binding. Max 50 lines.

100.0/100

1 trials · measured 8 days ago

estimate_bom scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.yyphilo/openfab, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-25100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: estimate_bom
[![Vouch score](https://vouch.tools/api/tools/98c2ce27-7d83-4b78-8ffc-e1cf2b9dbd46/badge.svg)](https://vouch.tools/tools/98c2ce27-7d83-4b78-8ffc-e1cf2b9dbd46)
estimate_bom — Vouch