calendar_weekday

shallow

dev.almanack/almanack · Verify this server

Which weekday a date falls on, as a 0-based index into the calendar's own week plus its name. Exact; never estimates. Returns weekday null when the date is an intercalary day the week does not count: those days sit outside the cycle and the week resumes after them exactly where it left off. Fails if the calendar defines no week rather than inventing a seven-day one.

100.0/100

1 trials · measured 2 days ago

calendar_weekday scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against dev.almanack/almanack, measured 31 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-31100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: calendar_weekday
[![Vouch score](https://vouch.tools/api/tools/98502fde-c21b-4337-a099-e295bde00897/badge.svg)](https://vouch.tools/tools/98502fde-c21b-4337-a099-e295bde00897)
calendar_weekday — Vouch