query_power_interconnection_queue_pjm_v1

shallow

build.exascale/osint · Verify this server

Query the PJM New Services (interconnection) queue — the public waiting line of projects that have REQUESTED to connect to the PJM grid (the mid-Atlantic RTO incl. Northern Virginia, PA, NJ, MD, OH, VA, WV and more). Returns cited, project-level records with PJM's full published structure: requested megawatts (`requested_max_output_mw` = MFO, `requested_summer_mw` = MW Capacity / summer net, `requested_winter_mw` = MW Energy / winter net), the realized built `in_service_mw` for completed projects, location (`state`, `county`, derived `county_fips`), `fuel` and `project_type` as PJM reports them, the single as-reported `status`, the study-document URLs and per-stage statuses, and lifecycle dates. Group or filter by `state`, `county_fips`, `status`, `project_type`, `capacity_or_energy`, `fuel`, `project_ac_dc`, `transmission_owner`, the study statuses, or (group only) `is_hybrid`; filter `submitted_date` by the `submitted_date_from` / `submitted_date_to` range. Pass each parameter as a top-level key of `params` (flat — not nested). Example: `{"state": "VA", "project_type": "Generation Interconnection", "status": "Active"}` for active generation requests in Virginia; `{"group_by": ["status"]}` for requested MW and project counts by status. Returns JSON aggregates with citations and optional row-level records when `include_records` is true; every value carries `source`, `as_of`, and a `source_row` verifiable with get_source_evidence_v1. The `requested_*` figures are REQUESTED capacity, not built: historically the large majority of queued megawatts withdraw before they are built. NEVER read a requested-MW total as installed or operating capacity — it is additive across distinct projects but is a REQUESTED total only. Filter `status` (Active / Withdrawn / In Service / Under Construction / …) to scope the queue; the full export is withdrawn-dominated. PJM also reports `in_service_mw` — the realized BUILT MW for in-service projects (a separate, built figure). For built/operating capacity use query_power_capacity_v1. PJM only — never summed, deduped, or compared across ISOs. For the MISO interconnection queue use query_power_interconnection_queue_v1; for the CAISO (California) queue use query_power_interconnection_queue_caiso_v1; for the NYISO (New York, incl. load interconnection requests) queue use query_power_interconnection_queue_nyiso_v1; for the ISO-NE (New England) queue use query_power_interconnection_queue_isone_v1; for the ERCOT (Texas) queue use query_power_interconnection_queue_ercot_v1; for the SPP (central US) queue use query_power_interconnection_queue_spp_v1. For PJM's NEW cluster/cycle process — the TC1/TC2 transition cycles and the reopened steady-state Cycle 1 (C01+), with cycle/stage/developer detail — use query_power_interconnection_queue_pjm_cycle_v1 (a separate PJM publication; never combined with this one). PJM reports no data-center / load type, and this tool does not infer one — that interpretation is the analyst's, from cited rows.

100.0/100

1 trials · measured 8 days ago

query_power_interconnection_queue_pjm_v1 scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against build.exascale/osint, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
open
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-25100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: query_power_interconnection_queue_pjm_v1
[![Vouch score](https://vouch.tools/api/tools/8d3f021c-e2d4-495c-9b8e-56656e94de1d/badge.svg)](https://vouch.tools/tools/8d3f021c-e2d4-495c-9b8e-56656e94de1d)
query_power_interconnection_queue_pjm_v1 — Vouch