get_market_calendar
shallowin.dalalos/mcp · Verify this server
Use this when the user asks what events are scheduled or happened across Indian markets in any date window: results, board meetings, dividends, splits. Get a unified, WHOLE-MARKET calendar of disclosed events across all NSE/BSE securities, over an ARBITRARY window (past or future). Use this instead of get_upcoming_results when you need a past window or multiple event types together; use get_upcoming_results instead when you just want a forward results window with a sector filter (a scoped convenience over the same results data this tool also reads). For ONE company's historical corporate-action timeline, use get_corporate_actions instead — that tool is per-stock; this one is market-wide. `date_from`/`date_to` are ISO dates (YYYY-MM-DD); `date_to` must be on or after `date_from` and the window is capped at 180 days. Both are optional: `date_from` defaults to today and `date_to` to 30 days after `date_from`. `types` optionally filters to a subset of `results, dividend, split, bonus, demerger, ipo` (plus the remaining corporate-action disclosure types: consolidation, rights, buyback, spinoff, merger, distribution, other) — an unknown type is a bad_request. Each event is `{date, type, isin, nse_symbol, name, detail}`, merged from results_calendar (results) and corporate_action_events (everything else) and sorted chronologically; `limit` (1..2000, default 150) caps the merged result; at most 300 events are returned per call, so narrow `types` or page by date. `ipo` is a stub — no IPO data source exists yet, so it always returns zero rows with an explanatory note. Raw disclosed facts only — no verdicts, no importance ranking beyond your own type filter.
1 trials · measured 11 days ago
get_market_calendar scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against in.dalalos/mcp, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- gated
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-11-12 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/81da8d85-1d2f-4458-ad69-7300f9da797c)