budget_history

shallow

org.lunenburgbudgetproject/archive · Verify this server

What a school budget line was in each year, AT ONE STAGE. The stage argument is required and singular on purpose: `proposed`, `settled` and `actual` are three different documents about the same year, and a growth rate measured from an actual to a budget is partly growth and partly the step between them. That mistake put a special education escalator 1.5 points too high here and was invisible until somebody asked how the number was derived. Note also that a budget line is NET — what the town must raise after grants, fees and state aid — so a line can rise because a grant ended rather than because anything cost more.

100.0/100

1 trials · measured 27 days ago

budget_history scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against org.lunenburgbudgetproject/archive, measured 11 Sept 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
open
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-09-11100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: budget_history
[![Vouch score](https://vouch.tools/api/tools/80eb3f31-6c26-4cc3-aa84-1a57fec1d6e3/badge.svg)](https://vouch.tools/tools/80eb3f31-6c26-4cc3-aa84-1a57fec1d6e3)
budget_history — Vouch