material_quote
shallowhouse.bim/bimhouse · Verify this server
[EN] Catalog-priced cost estimate: BOM, total, ¥/m², lead times and critical path from the BIM takeoff. / カタログ連携の概算見積もり。BIM 要素 takeoff × 建材カタログ実価格 (窓/ドア/設備) + 原単位 (躯体/仕上げ) で BOM・総額・㎡単価を算出し、各資材の納期 (lead_time_days) と在庫、クリティカルパス納期も返す。
100.0/100
1 trials · measured 8 days ago
material_quote scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against house.bim/bimhouse, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Category
- Developer infrastructure
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-08-25 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/7b0dea91-d019-4bfe-81ca-e2f94a2d4374)