vergabe_wartefrist

shallow

de.overfit/overfit · Verify this server

Returns both interpretations of the § 134 GWB standstill: the strict end date (no weekend shift, per VK Bund) and the conservative one (shifted to next working day, per OLG Bremen) — electronic dispatch 10 days, postal 15 days (Stand 2026-07-14). Use when the user asks on which date they may award a contract after informing unsuccessful bidders. The BGH has not resolved the weekend-shift question; present the conservative date as the safer choice. Do not use to compute tender or participation deadlines (use vergabe_fristen_berechnen for that). Example user questions: "Wann endet die Wartefrist nach § 134 GWB?"; "Ab wann darf ich den Zuschlag erteilen?"; "Wie lange muss ich nach der Bieterinformation warten?"; "10 Tage Wartefrist — wann ist das genau?"

100.0/100

1 trials · measured 2 days ago

vergabe_wartefrist scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against de.overfit/overfit, measured 6 Oct 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-10-06100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: vergabe_wartefrist
[![Vouch score](https://vouch.tools/api/tools/7833aebb-9c22-4979-8b6a-0bc215e1148f/badge.svg)](https://vouch.tools/tools/7833aebb-9c22-4979-8b6a-0bc215e1148f)
vergabe_wartefrist — Vouch