planitude_delay_impact

shallow

app.planitude/planitude · Verify this server

Answers "how much does the project finish move if this task is N days late?". Compares the delay with the task's total slack: within the slack the project finish does not move, beyond it the finish moves by the difference. Also lists the affected downstream tasks. Read-only calculation on the current plan, exact for a delay on a single task; nothing is saved.

100.0/100

1 trials · measured 12 days ago

planitude_delay_impact scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against app.planitude/planitude, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
gated
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-11-12100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: planitude_delay_impact
[![Vouch score](https://vouch.tools/api/tools/69726dcb-5e51-45af-a09b-ba6e6f099b06/badge.svg)](https://vouch.tools/tools/69726dcb-5e51-45af-a09b-ba6e6f099b06)
planitude_delay_impact — Vouch