review_specification

shallow

com.a2a2p/a2a2p · Verify this server

Instant, synchronous engineering review of a physical requirement — nothing is submitted or stored. Deterministic checks: material identification with handbook-typical properties (density, stiffness, yield, service temperature), explicit rectangular beam deflection and nominal stress with requester-defined acceptance criteria, material/process compatibility, tolerance-vs-process reality, quantity economics (e.g. tooling amortization), environment fit (UV, saltwater, food contact, temperature, medical), flexibility fit, post-processing validity, design-file format fit, and specification completeness. Returns findings ranked blocker/warning/info, two readiness scores, and a deterministic clarification_plan: compact next_fields, visible remaining_fields, optional CAD accelerators, an intent-only resolution handoff, next_call with the recommended exact MCP/REST continuation, and continuation_options for every operation explicitly eligible from a complete specification. Examples are shapes, never invented defaults. For a decomposed design, send specification.assembly with parts and interfaces: a2a2p then checks galvanic pairing and interface fit across parts, which a single-part review cannot, and prices each part separately. Two or more explicitly declared parts always classify as assembly_or_system and can never become quote_ready as one part, regardless of purpose wording or top-level part fields. Undeclared interfaces are unchecked — nothing is inferred. CHECK intake_classification first. a2a2p reviews one manufacturable part at a time; a request naming a behaviour rather than an object ("a device that detects and removes debris") is classified capability_concept and redirected to decomposition, because no material or tolerance can be derived from it. The classification is advisory, never blocks, and defers to any supplied specification. READ resolution_readiness, not quote_readiness, while you are still answering questions. quote_readiness is supplier-facing and stays capped by material/process/dimensions/tolerance that a2a2p derives for you, so it cannot reach quote_ready from intent alone however much you supply. resolution_readiness measures only what the requester owns and reaches ready_to_resolve once you have supplied enough to derive a specification — which is not a supplier quote. completeness.awaiting_requester and completeness.derivable_by_resolution say which fields are whose. Accepts the same input as request_physical_solution (structured intent/specification or legacy flat fields). For intent_only, complete requester context leads to submit_for_specification_resolution; for a supplied specification, apply only facts you know, re-review until quote_ready, then submit if a durable resolution is useful.

100.0/100

1 trials · measured 55 days ago

review_specification scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.a2a2p/a2a2p, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-25100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: review_specification
[![Vouch score](https://vouch.tools/api/tools/67086589-218a-451d-a9ed-ebeca9e221b0/badge.svg)](https://vouch.tools/tools/67086589-218a-451d-a9ed-ebeca9e221b0)
review_specification — Vouch