planitude_configure_simulation

shallow

app.planitude/planitude · Verify this server

Turns the Monte Carlo simulation on or off for a project and saves its parameters (iterations, distribution, default range for tasks without a three-point estimate, seed), replacing the saved values. With the simulation on, the Risk tab of the web interface computes it automatically. Omitted fields keep their value. It does not move any date. Requires write permission.

100.0/100

1 trials · measured 12 days ago

planitude_configure_simulation scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against app.planitude/planitude, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
gated
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-11-12100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: planitude_configure_simulation
[![Vouch score](https://vouch.tools/api/tools/62010e7b-b9fb-46d1-bdce-d39c8f745e8a/badge.svg)](https://vouch.tools/tools/62010e7b-b9fb-46d1-bdce-d39c8f745e8a)
planitude_configure_simulation — Vouch