tengu_v3_twap_plan

shallow

io.github.Hlobo-dev/tengu-firm · Verify this server

TWAP child-order schedule for a ticker: a qty (default 100) sliced into evenly-timed child orders over `minutes` (default 60). Call this when the user asks how to work an order over time; use vwap_plan for a volume-curve schedule and cost_estimate for expected cost.

100.0/100

1 trials · measured 8 days ago

tengu_v3_twap_plan scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.Hlobo-dev/tengu-firm, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
unreachable
Category
Finance & compliance
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-25100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: tengu_v3_twap_plan
[![Vouch score](https://vouch.tools/api/tools/5c2162e3-e992-476a-97c5-32c71b6d18a8/badge.svg)](https://vouch.tools/tools/5c2162e3-e992-476a-97c5-32c71b6d18a8)
tengu_v3_twap_plan — Vouch