rip_replace_deadlines
shallowcom.tensorust/ontology · Verify this server
FCC rip-and-replace (SCRP) program record: 126 granted applications and 85 recipients with approved cost estimates (DA 22-774), applications grouped by RRD deadline after the May 1 and Sep 3, 2026 extension orders with the final certification, claim, extended claim and final spending report dates for each group, and the recipients named under a reimbursement hold. Optional application (SCRP0001xxx) returns that one application. Free.
1 trials · measured 13 days ago
rip_replace_deadlines scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.tensorust/ontology, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-11-12 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/4d69deb7-1044-4e80-93bb-0c34a38b06a0)