ibc_inspection_dates

shallow

com.fortitude21/dangerous-goods · Verify this server

Work out an IBC's next leakproofness test, 2.5-year and 5-year inspections, the last month it may be filled and (UN/ADR, plastic and composite IBCs) the end of its five-year life. Dates as MM/YYYY, "March 2024" or YYYY-MM.

100.0/100

1 trials · measured 37 days ago

ibc_inspection_dates scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against com.fortitude21/dangerous-goods, measured 20 Oct 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-10-20100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: ibc_inspection_dates
[![Vouch score](https://vouch.tools/api/tools/469340da-683a-43bd-a0cf-2e0c6e801082/badge.svg)](https://vouch.tools/tools/469340da-683a-43bd-a0cf-2e0c6e801082)
ibc_inspection_dates — Vouch