permit_timeline

shallow

fyi.contractors/contractors · Verify this server

Days from permit application to issue, and from issue to final inspection, from the dates on city permits, with the number of permits and the dates they cover. Final-inspection times count finished jobs only.

100.0/100

1 trials · measured 2 days ago

permit_timeline scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against fyi.contractors/contractors, measured 6 Oct 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
open
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-10-06100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: permit_timeline
[![Vouch score](https://vouch.tools/api/tools/3cb04e08-050d-4161-999d-905843d6efdd/badge.svg)](https://vouch.tools/tools/3cb04e08-050d-4161-999d-905843d6efdd)
permit_timeline — Vouch