permit_timeline
shallowfyi.contractors/contractors · Verify this server
Days from permit application to issue, and from issue to final inspection, from the dates on city permits, with the number of permits and the dates they cover. Final-inspection times count finished jobs only.
100.0/100
1 trials · measured 2 days ago
permit_timeline scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against fyi.contractors/contractors, measured 6 Oct 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-10-06 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/3cb04e08-050d-4161-999d-905843d6efdd)