calculate_pi_portal_timescales

shallow

io.github.Ments123/dmd-costs-tools · Verify this server

Works out the timescales in the Pre-Action Protocol for Low Value Personal Injury Claims in Road Traffic Accidents, the EL/PL protocol and the RTA Small Claims (OIC) protocol, in business days: the CNF response (15 or 30 business days RTA, 30 employers' liability, 40 public liability; RTA small claims 30 or 40), interim payments, the Stage 2 consideration and negotiation periods and their extensions, settlement and non-settlement payments, the Court Proceedings Pack, the exit points and Stage 3 under PD 49F. Dates beyond the bank-holiday data are never given as firm. It never advises on liability, value or settlement.

100.0/100

1 trials · measured 12 days ago

calculate_pi_portal_timescales scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.Ments123/dmd-costs-tools, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
self-provisionable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-11-12100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: calculate_pi_portal_timescales
[![Vouch score](https://vouch.tools/api/tools/39cc239b-b87b-4746-a5ea-2f98c1caa3a3/badge.svg)](https://vouch.tools/tools/39cc239b-b87b-4746-a5ea-2f98c1caa3a3)
calculate_pi_portal_timescales — Vouch