planitude_update_task
shallowapp.planitude/planitude · Verify this server
Changes an existing task: name, duration, type, scheduling constraint, deadline, notes, position, or three-point estimate (optimistic/pessimistic, used by the Monte Carlo simulation), then recalculates the dependent dates. The previous values are overwritten. Constraints follow MS Project: asap, alap, start_no_earlier_than, start_no_later_than, finish_no_earlier_than, finish_no_later_than, must_start_on, must_finish_on; all but asap/alap need constraintDate. For progress use planitude_set_progress. Requires write permission.
1 trials · measured 12 days ago
planitude_update_task scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against app.planitude/planitude, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- gated
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-11-12 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/2633d51b-11d9-4843-9e36-9d7f75a6caf6)