preflight_subcontractor_invoice

shallow

io.github.juodoc/ap-control · Verify this server

Check a subcontractor invoice against supplied commitment, retainage, schedule-of-values, work, lien-waiver, and insurance evidence. It does not determine legal validity of documents.

100.0/100

1 trials · measured 8 days ago

preflight_subcontractor_invoice scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against io.github.juodoc/ap-control, measured 25 Aug 2026 under methodology v0.2.0. Every measured component scored 100.

Component breakdown

ComponentWeightValue
Reliability35%not applicable
Schema integrity25%100.0
Failure behaviour15%not applicable
Latency15%not applicable
Concurrency10%not applicable

Tool details

Transport
remote
Credential class
unreachable
Input schema
not declared
Output schema
not declared
Side-effect classification
unclassified

Score history

DayScoreTierMethodology
2026-08-25100.0shallowv0.2.0

Probe evidence

ProbeOutcomes
schema_integritypass: 1

Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.

Embed this score

Available for every tool, scored or not — not a verification perk. Always links back to this page.

Vouch score: preflight_subcontractor_invoice
[![Vouch score](https://vouch.tools/api/tools/207ed814-3aa7-4dae-8b44-4867481455d0/badge.svg)](https://vouch.tools/tools/207ed814-3aa7-4dae-8b44-4867481455d0)
preflight_subcontractor_invoice — Vouch