ledger_plan_delete
shallowai.zerowidth/zerowidth · Verify this server
Removes one plan item while its decision is open, for an item added by mistake or work that's no longer planned. If the work was planned and then dropped, prefer ledger_plan_update with status 'skipped' so settlement can see it. Fails with conflict once the decision is settled. May return `needs_confirmation`.
1 trials · measured 11 days ago
ledger_plan_delete scores 100.0/100 on Vouch's measured behaviour index, from 1 real invocation trials against ai.zerowidth/zerowidth, measured 12 Nov 2026 under methodology v0.2.0. Every measured component scored 100.
Component breakdown
| Component | Weight | Value |
|---|---|---|
| Reliability | 35% | not applicable |
| Schema integrity | 25% | 100.0 |
| Failure behaviour | 15% | not applicable |
| Latency | 15% | not applicable |
| Concurrency | 10% | not applicable |
Tool details
- Transport
- remote
- Credential class
- open
- Input schema
- not declared
- Output schema
- not declared
- Side-effect classification
- unclassified
Score history
| Day | Score | Tier | Methodology |
|---|---|---|---|
| 2026-11-12 | 100.0 | shallow | v0.2.0 |
Probe evidence
| Probe | Outcomes |
|---|---|
| schema_integrity | pass: 1 |
Raw request/response logs are not archived yet — the outcome counts above are drawn directly from every recorded trial.
Embed this score
Available for every tool, scored or not — not a verification perk. Always links back to this page.
[](https://vouch.tools/tools/1e299528-6b53-4ec7-861e-25bea6d04093)